Scope of work included the fabrication, lift, set and integration of the generation, compression and production modules to the hull and the interconnection of all structures, piping, cabling and testing of these systems. Additional work included the fabrication, loadout and seafastening of six pipeline end termination foundation piles and 16 mooring piles.